Description
-
- The backfill between the construction cut and the masonry which makes up the lining of the soakaway. Construction cut back fill (CM)
-
- Gary Webster
- 29-5-2008
Description
- Backfill
Basic Interp.
Description
- Moderate
- Dark greyish blue
- sandy silt
- Moderate pot
- Length: 1.73m, Width: 1.6m
Finds
-
Issued to
Gary WebsterIssued on
30-5-2008 -
Compiled by
- Gary Webster
Compiled on
29-5-2008 -
Checked by
- Chaz Morse