Basic Information
- Soakaway
Sub Groups
-
Sub Group: PCO06_384
- Construction elements of soakaway and primary fill
Group Description
-
- Underlying the modern overburden lay (1279), the latest fill of soakaway {1278}, that also contained fills (1282) <93>, (1287), and primary fill (1277). {1278} was built into construction cut [1276], which was dug in to agricultural soil (1288).
-
- Chaz Morse
- 27-10-2011
-
- Underlying the modern overburden lay (1279), the latest fill of soakaway {1278}, that also contained fills (1282) <93>, (1287), and primary fill (1277). {1278} was built into construction cut [1276], which was dug in to agricultural soil (1288).
-
- Chaz Morse
- 27-10-2011
Dating Information
-
- The limited pottery recovered from the lower fills of this soakaway was dated to 1660-1870AD.
-
- Chaz Morse
- 27-10-2011