Contexts
-
Context: PCO06_1314
- 19th C wall
-
Context: PCO06_2172
- Construction cut for 1314
Subgroup Narrative Text
-
- Underlying the modern overburden lay Late Post Medieval walling {1314}, which formed the lower wall of housing that would have fronted onto South Tenter Street, and which was dug into construction cut [2172], which was dug into a series of earlier Post Medieval features.
-
- Chaz Morse
- 18-7-2011
Dating Narrative
-
- The frogged brick used in the construction of these walls indicate a Late Post Medieval date.
-
- Chaz Morse
- 18-7-2011