v1.2.d
Anonymous User  |  Help  |  Logout

Record View

Basic Information

  • Wall, construction cut and backfill
  • 2107

Contexts

  • Context: PCO06_2107
    • Georgian wall
  • Context: PCO06_2164
    • Backfill of [2165]
  • Context: PCO06_2165
    • Construction cut for [2107]

Subgroup Narrative Text

    • Late Post Medieval drain {2038} was built over (2164), the construction back fill of cut [2165], dug for wall {2107}, that formed the east end of a Stuart/Georgian brick building that would have fronted onto Prescot Street. Construction cut [2165] was dug into (2155)=(2163), bedding layers for earlier masonry elements.
      • Chaz Morse
    • 1-8-2011

Dating Narrative

    • The stratigraphic position, form and function of these features, and the materials used in their construction, demonstrate them to be Late Post Medieval.
      • Chaz Morse
    • 1-8-2011

Subgroup Plan

Group

  • Strat. Group: PCO06_341
    • Post Medieval housing elements