  • Construction elements of soakaway and primary fill
  • 1276 1278

Contexts

  • Context: PCO06_1276
    • Construction cut of soakaway
  • Context: PCO06_1277
    • Backfill between soakaway cut and masonry
  • Context: PCO06_1278
    • Brick lining of soakaway
  • Context: PCO06_1287
    • Lower fill of 1276

Subgroup Narrative Text

    • Underlying the modern overburden lay (1279), the latest fill of soakaway {1278}, that also contained fills (1282) <93>, (1287), and primary fill (1277). {1278} was built into construction cut [1276], which was dug in to agricultural soil (1288).
      • Chaz Morse
    • 18-7-2011

Dating Narrative

    • The limited pottery recovered from the lower fills of this soakaway was dated to 1660-1870AD.
      • Chaz Morse
    • 18-7-2011

Subgroup Plan

Group

  • Strat. Group: PCO06_148