v1.2.d
Anonymous User  |  Help  |  Logout

Record View

Basic Information

  • Soakaway and related construction elements
  • 1683 1685 1687 310 311

Contexts

  • Context: PCO06_309
    • Fill of 310
  • Context: PCO06_310
    • Soak Away
  • Context: PCO06_311
    • Cut for 310
  • Context: PCO06_312
    • Backfill of 310
  • Context: PCO06_1684
    • Fill of con cut of (1685)
  • Context: PCO06_1685
    • Cut of soak away (con cut)
  • Context: PCO06_1686
    • Fill of soakaway (1687)
  • Context: PCO06_1687
    • masonry of soakaway (1685)

Subgroup Narrative Text

    • Underlying the modern overburden lay (1686), the fill of soakaway {1687}, built into construction cut [1685], which was dug into pit fill (1803), the fill of Roman pit [1804]. This soakaway was also recorded in the evaluation.
      • Chaz Morse
    • 29-7-2011

Dating Narrative

    • The form and function, and stratigraphic position of this feature demonstrate that it is Late Post Medieval.
      • Chaz Morse
    • 29-7-2011

Subgroup Plan

Group

  • Strat. Group: PCO06_320
    • Cluster of Post Medieval drainage features