Photos from 3rd March 2008
- By: Lorna Richardson |
- Mar 04, 2008
- Share
- del.icio.us
Trench 3
Aldgate
| archaeology
| prescot
| site
| diggers
| evaluation
| Prescot Street
| Dig
| Excavation
| Trench
| London
| E1
The diggers clean the later deposits in trench 3 before we continue with the machine excavation.
These photos taken on the 3rd of March show the site progressing. The piling rig is preparing the way for us by making the perimeter of the site safe to excavate
Posted Jan 25, 01:57 PM.
Taken Feb 24, 01:40 PM.