Photos from 3rd March 2008
- By: Lorna Richardson |
- Mar 04, 2008
- Share
- del.icio.us
Outhouse floor
The brick floor of an outhouse at the rear of an 18th century building. The outhouse may be a later addition
These photos taken on the 3rd of March show the site progressing. The piling rig is preparing the way for us by making the perimeter of the site safe to excavate
Posted May 12, 08:01 AM.
Taken May 8, 06:49 PM.