Zone 1 being backfilled
Now that it has been completed and handed over, Zone 1 is ready to be built on.
These photos taken on the 3rd of March show the site progressing. The piling rig is preparing the way for us by making the perimeter of the site safe to excavate
Posted May 30, 09:40 AM.