Photos from 3rd March 2008
- By: Lorna Richardson |
- Mar 04, 2008
- Share
- del.icio.us
(1801) after partial lifting of the grave goods
A further photo following removal of the millefiori bowl and secondary cremation
These photos taken on the 3rd of March show the site progressing. The piling rig is preparing the way for us by making the perimeter of the site safe to excavate
Posted Sep 15, 08:26 AM.
Taken Sep 11, 12:00 AM.